Painting hazards and controls, ready to check
When the job is on an older house or at height, Gate Ready adds the hazards (lead paint, scaffold use and overhead service lines) and controls like these. Each one shows its type.
- AdminPaint tested for lead before it is sanded, scraped, heated or demolished (older buildings often have it)
- SubstituteWet scraping or chemical strippers used instead of machine sanding, dry sanding, grinding or burning off
- IsolateWork area contained with drop sheets or screens; other people, especially children and pregnant women, kept out
- EngineerCleaning done with an H-class vacuum and wet wiping; no dry sweeping or compressed air
- EngineerGap between the scaffold platform and the building no more than 225 mm, and a clear walkway at least 450 mm wide
- AdminScaffold handover certificate kept on site, and scaffold checked before first use
- EngineerNon-conductive (fibreglass) ladders used near live electrical work
Hazardous chemicals, dust, sun and heat, and slips are in the list too. You choose the ones that fit your job. A risk of a fall of more than 2 m is on the model national list of high risk construction work, and some states set their own height rules, so check your regulator. Gate Ready suggests, you review.