Roof hazards and controls, ready to check
When the job is at height, Gate Ready adds the hazards (a fall from an edge or ladder, a fall through brittle roofing or a skylight, falling objects, and storms and lightning) and controls like these. Each one shows its type.
- IsolateEdge protection (guardrail, mid-rail and toe-board) installed on all open edges before work starts
- EngineerSkylights, penetrations and brittle roofing covered or meshed before access
- AdminEvery roof treated as fragile until a competent person says it is not
- AdminExclusion zone below the work area; tools and materials secured against falling
- AdminStop work in high wind, rain, or when surfaces are wet or icy
- AdminForecast checked before work and again at smoko; the stop-work points for this job written down and told to the crew
- AdminOverhead powerlines identified; plant, scaffold and ladders kept outside the network operator’s approach distances
Scaffold, an elevating work platform, travel restraint and a catch platform are in the list too, and start unticked. You choose the ones that fit your job. A risk of a fall of more than 2 m is on the model national list of high risk construction work, and some states set their own height rules, so check your regulator. For jobs on a roof, a severe weather group is suggested too. Bird and bat droppings steps appear for roof cleaning and gutter work. Gate Ready suggests, you review.